Ireland time
Nepal time
नेपाली
Nepal

Work speeds up on 108-foot World Peace Kalash at Panchakot in Baglung

Construction of the 108-foot Vishwashanti Gandaki Kalash at Panchakot, Baglung, is moving again under a federal multi-year plan after years of delay. The third floor of a planned 13-storey structure is being prepared.

This short update was prepared automatically from other news outlets’ reporting and has not yet been reviewed by an editor.

Illustration: Himalaya mountains and a Nepali temple roof
Nepal Ireland News illustration

Construction of a 108-foot-tall Vishwashanti Gandaki Kalash, a large water-pot monument, is gathering pace at Panchakot in Baglung. It had been stalled for a long time because of a lack of funds. The news appeared on 7 Mangsir 2083, according to Ratopati and OnlineKhabar, both of which carried a report from the state news agency RSS.

The work is being carried out at Sarvasiddhidham Panchakot in Baglung Municipality-6. The federal government's Department of Urban Development and Building Construction is overseeing it under a multi-year plan, at a cost of Rs 7 crore. The structure will have 13 floors, and preparations are now under way to cast the concrete for the third floor.

The foundation stone was laid about 12 years ago, in 2071 BS, in the presence of dignitaries including the then Prime Minister Sushil Koirala. The idea came from Swami Kamalnayanacharya Muktinath Baba, who wanted to make Panchakot a world-class religious and tourist destination. Budget shortages kept the kalash from progressing, although other facilities costing crores of rupees were built and have drawn religious visitors.

Jagannath Acharya, chair of the Panchakot Development Council, said construction has moved forward over the past year through a contractor under the multi-year plan. The aim is to finish the outer structure within the next two years. The master plan calls for a concrete building with 13 floors and a lift, which will look like a 108-foot kalash from outside. The outer structure will be built through a contracting process, while donations and support will be sought for the kalash's final form and interior, Acharya said.

The detailed project report estimates that the full cost will exceed Rs 45 crore. The plan is to raise the money from government support, donations from devotees and contributions gathered at mahayagya ceremonies held over the years.

The council says the kalash will carry a message of protecting and promoting water resources. It will symbolise rivers and other forms of water and highlight Gandaki civilisation. The council says the goal is to build the world's largest and tallest kalash.

Once finished, it is expected to add to Panchakot's appeal, become an important centre of faith for followers of Vedic Sanatan dharma and help local economic and social development.

Hundreds of tourists now visit Panchakot every day. Existing structures include a three-storey residential building, a Gandaki Mata temple, a Sheesh Mahal, a 5,555-kilogram great bell, Hanuman Shila and Garud Shila.

Comments (0)

  1. No comments yet. Be the first to comment.

Leave a comment

Please be respectful. Abuse, hate, false accusations and adverts are removed. Your name and comment are public; no email is needed.